A micro module computer room is a highly integrated, rapidly deployable data-center infrastructure. It combines power distribution, temperature control, cabinet access, cabling, and monitoring into a single self-contained module, eliminating the need for traditional long-cycle civil construction. Because all subsystems arrive pre-engineered, deployment is significantly faster than a conventional build-out.
The system is widely used across financial institutions, hospitals, schools, telecommunications operators, and general enterprise environments.
Two main aisle layouts are supported:
Cabinets are available in the following sizes (H × W × D):
| Height | Width | Depth |
|---|---|---|
| 2,000 mm | 600 or 800 mm | 1,200 mm |
| 2,000 mm | 600 or 800 mm | 1,100 mm |
| 2,200 mm | 600 or 800 mm | 1,200 mm |
Usable rack space per cabinet is 42U or 47U, and each cabinet supports a load of ≤ 1.5 t.
Cabinets use a front-and-rear mesh door design with a through-hole rate of ≥ 75%, ensuring efficient airflow through the cold/hot aisle containment architecture. The roof can be configured as a self-resetting flip-up roof, a drop-down flip-up roof, or a fixed roof depending on the installation requirement. Door opening mode is automatic sliding door or sliding doors.
Precision in-row air conditioners are positioned between cabinet columns and are available in four cooling capacities:
| Cooling Capacity | Indoor Unit Size (H × W × D) |
|---|---|
| 25 kW | 2,000 × 300 × 1,100 mm |
| 35 kW | 2,000 × 300 × 1,200 mm |
| 46 kW | 2,000 × 600 × 1,200 mm |
| 165 kW | 2,000 × 600 × 1,200 mm |
All indoor units carry an IP23 internal rating; external units carry an IP55 rating. Cabinets themselves are rated IP20. Input power for air-conditioning units is 380/400/415 VAC, 50/60 Hz, 3Ph+N+PE.
Precision power distribution cabinets are installed at the head of each column and feature:
The micro module computer room can be installed directly on a cement floor or on a raised floor, providing installation flexibility that suits both new and retrofit facilities. No specialised sub-floor infrastructure is mandatory.
Published comparison data highlights the following differences:
| Metric | Traditional DC Build | Micro Module Solution |
|---|---|---|
| Deployment cycle | 3–6 months | 1–2 weeks |
| Energy efficiency (PUE) | 1.8–2.5 | 1.2–1.5 |
| Installation flexibility | Fixed structure | Modular / scalable |
| Cooling precision | Room-level (low) | In-row (high) |
| Initial capex | High (civil works) | Lower (prefabricated) |
The modular design also supports expansion from a single-row to a double-row configuration as capacity requirements grow.
The system integrates a management platform that covers:
Documented application areas include financial systems, hospitals, schools, telecommunications operators, and general enterprises and institutions. The rapid-deployment, space-saving design makes it particularly relevant where floor space is limited or where fast commissioning is required.
Suzhou ACDC New Energy Technology Co., LTD., headquartered in Suzhou High-tech Zone, China, designs and supplies the micro module computer room. The company's in-house capabilities span system design and integration, battery management systems (BMS), energy management systems (EMS), and thermal management systems, and it offers customised solutions to individual project needs.
THE COMPANY
Suzhou ACDC New Energy Technology Co., LTD., headquartered in Suzhou High-tech Zone, is a leadinglithium energy storage system provider from China. As a team with decades of experiences on thermalmanagement system, outdoor cabinet design, battery management system and energy managementsystem through loT technology, we are committed to the integration of loT and clean energy revolution.…
About Us ↗Visit company website ↗YOUR NEXT STEP
Use case, specification, quantity and delivery window: make the next conversation specific.