An outdoor power supply cabinet must fit the site, protect installed equipment, carry its intended battery load, and manage heat and battery gases. Our Outdoor integrated temperature control cabinet uses separated equipment and battery compartments, 19-inch equipment compatibility, IP55 body protection, thermal insulation, and an exhaust device. Use these points to structure sampling, packaging, quantity, delivery, documents, and supplier checks before placing a bulk order.
Measure the proposed 650 × 650 × 1400 mm cabinet against the installation pad, doorway, access route, lifting path, and service space; record customized dimensions on the approved drawing.
Verify that the sample or pre-shipment unit uses hot-dip galvanized steel, cold plate steel, and color steel insulation board, and inspect panel joints, door fit, mounting points, coating coverage, and damage.
Confirm the two equipment compartments and one battery compartment, then check the 19-inch mounting points, battery space, cable routes, door operation, and separation between equipment and batteries.
Compare the planned equipment and battery weight, including weight distribution, with the stated cabinet load of at least 500 kg.
Inspect the IP55 protection arrangement at doors, seams, cable openings, and exhaust components, and request the supplier's inspection or test record for the finished configuration.
Verify door-panel thermal insulation cotton and trace the exhaust path from the battery compartment to the outlet, including installation clearance and outlet orientation.
Check the grounding bar, bonding points, and insulation-resistance result between the grounding bar and metal workpieces against the stated value below 0.1 Ω.
Compare cabinet labels, accessories, package count, and packing list with the purchase order and approved configuration before acceptance.
An outdoor power supply order should begin with the equipment and battery arrangement. Our Outdoor integrated temperature control cabinet is used for wireless communication base stations, 5G systems, communication networks, access or transmission switching base stations, emergency communications, and related power or battery equipment.
The comprehensive cabinet contains two equipment compartments and one battery compartment. The equipment cabinet is a separate enclosure for standard 19-inch equipment, while the battery cabinet is designed for mounting batteries. Ask us to confirm the selected configuration against your equipment list before releasing the order.
The reference dimensions are 650 × 650 × 1400 mm, with customizable dimensions. Measure the installation pad, doorway, access route, lifting path, and service area against the proposed drawing. A cabinet may fit the equipment while still creating a delivery problem if it cannot pass through the site entrance. Include these measurements in the quotation request.
The cabinet uses hot-dip galvanized steel, cold plate steel, and color steel insulation board. During sample inspection, compare the material schedule with the quotation and drawing. Check panel joints, door fit, corners, mounting points, base areas, and any surfaces that may be exposed to moisture or handling damage.
The surface treatment includes rust removal, antirust phosphating or galvanizing, and PANTONE 428C spraying. Ask us to identify the agreed treatment sequence and color reference in the order file. Inspect the sample for continuous coating, clean edges, secure hardware, and damage-free surfaces. Photograph the exterior, interior, grounding bar, exhaust opening, and rack mounting points for the inspection record.
The cabinet load is at least 500 kg, and the body protection level is IP55. Compare the planned equipment and battery weight with the cabinet load requirement, including weight distribution. Ask the supplier to identify load-bearing parts and to confirm how the IP55 protection arrangement applies to doors, seams, cable routes, and exhaust openings.
The insulation resistance between the grounding bar and metal workpieces is less than 0.1 Ω. Check that the grounding bar is accessible, bonding points are identified, and the inspection record uses the same configuration and test points as the ordered cabinet.
The door panel is covered with thermal insulation cotton, and the cabinet has an exhaust device for releasing harmful gases produced by the battery. These features should appear on the cabinet drawing because they affect the door construction, battery compartment, exhaust route, and installation clearance.
During sample review, confirm that the insulation is fitted to the specified door panels without obstructing closing, seals, rack space, or cable routing. Trace the exhaust route from the battery compartment to the outlet. Ask for the exhaust device location, power requirement when applicable, outlet orientation, and required clearance in the quotation response.
Picture a communication site where technicians access the equipment compartment while batteries remain in their dedicated zone. Check which door, rack position, and cable route serve each function. Measure the service area around the cabinet and confirm that the exhaust outlet will not face an obstruction or an intake.
Request a sample, pre-production unit, or inspection point that represents the final size, materials, surface treatment, compartment layout, and customized features. Compare it with the approved drawing using a written checklist.
The inspection should cover external dimensions, door operation, panel alignment, 19-inch mounting points, battery compartment space, insulation cotton, exhaust device, grounding bar, surface finish, and labels. Record deviations with photographs and obtain written disposition before bulk production continues.
For a customized cabinet, place the approved drawing, material schedule, finish, protection level, load requirement, and electrical inspection method in the purchase file. Ask how samples are handled, whether a sample charge applies, who pays shipping, which inspection stage is available, and how sample changes are controlled.
Packaging should protect painted panels, doors, rack fittings, grounding parts, and exhaust components from impact, moisture, and movement. Request the proposed packing method, package dimensions, gross and net weight, lifting points, stacking limits, moisture protection, and packing list.
Confirm whether loose accessories are packed inside the cabinet, separately, or attached to the package. Before shipment, match each cabinet label with the purchase order and approved configuration. For a multi-unit order, ask how customized cabinets are numbered and distinguished.
The packing list should identify cabinet quantity, accessories, package count, dimensions, weights, and shipping marks needed for receiving and installation. This information also helps you plan unloading equipment and storage space at the destination.
Request the supplier's MOQ, production capacity for your configuration, production lead time, inspection timing, shipment readiness date, shipping term, and payment terms in the quotation. Ask whether customized dimensions or surface treatment change the MOQ or lead time.
Build the request around the quantity required for the site, any spare units, destination, and target installation date. A bulk order may contain several cabinet configurations, so ask the supplier to identify whether the MOQ and production schedule apply per model, per configuration, or to the complete order.
We should confirm the schedule against the actual cabinet arrangement before you commit to installation work, freight bookings, or downstream equipment delivery.
Compare suppliers on how clearly they connect the technical drawing, parameters, sample, inspection method, packing plan, and quotation. The supplier response should identify the exact cabinet configuration and show how customized requirements are controlled.
Request a general arrangement drawing showing the reference or custom dimensions, compartment layout, 19-inch mounting positions, doors, exhaust route, grounding bar, lifting points, and cable openings. Request the material and surface-treatment specification, IP55 inspection or test record, flame-retardancy test report for the GB5169.7 test A requirement, insulation-resistance test record, final inspection report, and packing list.
For a customized cabinet, also request a sample approval record and revision or change-control record. Compare the supplier's documents with the unit inspected during sampling. A mismatch between the drawing, test record, label, and delivered cabinet should be resolved before acceptance.
We supply this cabinet for outdoor communications and battery or power equipment applications. Site fit and order configuration should be settled before production. Send the equipment list, battery arrangement, site dimensions, required quantity, destination, target date, and requested documents with your inquiry so we can return a comparable quotation.
Yes. The reference dimensions are 650 × 650 × 1400 mm, and the cabinet dimensions are customizable. Send the available footprint, height limit, access route, equipment clearance, and battery arrangement. Ask us to show the revised external dimensions and internal compartment layout on the quotation drawing, then use that revision for sample approval and final inspection.
The equipment cabinet uses a standard 19-inch setting for various 19-inch equipment. Provide the equipment list and mounting depth for layout review. Check the number and position of mounting points, cable entry direction, service clearance, and separation from the battery compartment on the approved drawing before ordering.
Check its dedicated location, available battery space, door insulation, exhaust path, grounding connection, and access for installation and maintenance. The cabinet has two equipment compartments and one battery compartment. Send battery dimensions and weight distribution so the supplier can align the layout with the cabinet load requirement and customized size.
The specified resistance between the grounding bar and metal workpieces is less than 0.1 Ω. Ask for the inspection method, test points, and results for the finished configuration. At receipt, verify that the grounding bar and bonding points match the drawing and that the inspection record identifies the same cabinet arrangement.
Our Outdoor integrated temperature control cabinet fits projects that need separated battery and equipment zones, 19-inch installation, outdoor body protection, thermal insulation, and battery-gas exhaust. Prepare the equipment list, battery dimensions and weights, site access measurements, custom size, quantity, destination, target date, packing needs, and requested inspection documents before asking for the quotation.
The company
Suzhou ACDC New Energy Technology Co., LTD., headquartered in Suzhou High-tech Zone, is a leadinglithium energy storage system provider from China. As a team with decades of experiences on thermalmanagement system, outdoor cabinet design, battery management system and energy managementsystem through loT technology, we are committed to the integration of loT and clean energy revolution.…